Go Back   Two Wheel Fix > In the Garage or Shop > Aftermarket Modding

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-03-2010, 09:33 AM   #11
ontwo
Designated Drinker
 
ontwo's Avatar
 
Join Date: Jul 2008
Location: shitville
Moto: 2009 ZX6R
Posts: 1,661
Default

Ok, so I got a little more done last night in the heat.

First, made a jig to keep the alignment of my wheels.



Measured for a possible 6" or 8" stretch



Next, cut away the swingarm while keeping the axle plates



Decided on the 8" stretch to give me plenty of room under the seat for the battery, electrical. Fixed a block in front of the rear wheel to keep it in place at my measurement.



After blowing up my POS grinder and a trip to Lowes for a new one, lots of grinding



My hardtail "kit"


First piece cut and set in place for a look.





That was as far as I got last night. Tonight will be more cutting and fitting. Anybody got advice on notching the tubing to the axle plates? The way I'm doing it just doesn't seem right.
__________________
ontwo is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 07:40 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.